• Phone: 07 3205 1965
  • Phone: 07 3205 1965
  • Wishlist
  • My Account
    • Login
    • Sign Up
  • Shopping Cart 0
Toggle menu
Aquifer Pumps
×
×

Shop By Category

  • Shop by Brand
    • Atlas Filtri
      • Cartridge Filter Systems
      • UV Water Disinfection
      • Hydra Self Cleaning Filters
      • Filter Cartridges
    • Bianco
      • Bianco Pressure Pumps
      • Bianco Submersible Pumps
      • Bianco tank disinfectant
      • Bianco Engine Drive Pumps
    • DAB
      • DAB Pressure Pumps
    • Davey
      • Davey Pressure Pumps
      • Davey Pressure Tanks
      • Davey Rainbank Pumps
      • Davey Sump Pumps
      • Davey Fire Fighter Pumps
      • Davey Transfer Pumps
      • Davey Pool Pumps
      • Davey Water Filtration
    • Grundfos
      • Grundfos Pressure Pumps
      • Grundfos Pressure Tanks
      • Grundfos Sump Pumps
      • Grundfos Circulator Pumps
      • Grundfos Vertical Multistage
      • Grundfos End Suction Pumps
      • Grundfos Spare Parts
    • Lowara
      • Lowara Sump Pumps
    • Mono
    • Puretec
    • Southern Cross
      • Southern Cross Sovereign
      • Southern Cross Starline
  • Shop by Application
    • Pressure Pumps
      • Grundfos Pressure Pumps
      • Davey Pressure Pumps
      • DAB Pressure Pumps
      • Bianco Pressure Pumps
    • Pressure Tanks
      • Grundfos Pressure Tanks
      • Davey Pressure Tanks
    • Pool Pumps
      • Davey Pool Pumps
    • Rainwater to Mains
      • Davey Rainbank Pumps
      • Acquasaver
    • Fire Fighting Pumps
      • Bianco Vulcan Engine Driven Pumps
      • Davey Firefighter Pumps
    • Sump Pumps
      • Grundfos Submersible Pumps
      • Davey Submersible Pumps
    • Transfer Pumps
      • Davey Transfer Pumps
    • Pumps for Concrete Plants and Quarries
      • Heavy Duty Submersible Pumps
    • Borehole Submersible
      • Grundfos Borehole Submersibles
    • Circulator Pumps
      • Grundfos Circulator Pumps
    • End Suction Pumps
      • Southern Cross End Suction Pumps
  • Filtration
    • Atlas Filtri Filtration
      • Cartridge Filter Systems
      • UV Water Disinfection
      • Hydra Self Cleaning Filters
      • Filter Cartridges
      • Water Tank Disinfection
    • Puretec
      • One Tap Undersink System
      • Mains Water Filtration
      • Tank Water Filtration
      • Filter Cartridges and UV Lamps
    • Davey Microlene Filtration
      • One Tap Undersink System
      • UV Water Disinfection
      • Water tank disinfection
      • Filter cartridge replacements
      • Cartridge filter systems
      • Acquasafe
  • Pump Accessories
  • Pipework and Fittings
    • Blueline Poly Pipe
    • Nyglass Threaded Fittings
      • Barrel Union Nyglass
      • Female Tee Threaded
      • Foot Valve Nyglass
      • Hex Nipple
      • Hex Plug Nyglass
      • Hex Socket
      • Hose Tail Nyglass
      • Reducing Bush
      • Reducing Hex Nipple
      • Reducing Hex Socket
      • Threaded Female Elbow
      • Threaded Male/Female Elbow
    • Tank Float Valves
    • Fittings for Blueline Poly
    • Pressure Tank Hoses
    • Rural Poly Pipe
    • Suction Hoses
    • Fittings for Rural Poly
    • Y Strainers
  • Shop All
  • Shop By Brand

  • Davey
  • Grundfos
  • DAB
  • Puretec
  • Atlas Filtri
  • Bianco
  • Plasson
  • Microlene
  • Lowara
  • Mono
  • View all Brands
    • Shop by Brand
    • Selection Guides
      • Grundfos Pressure Pump Selection Guide
      • Davey Pressure Pump Selection Guide
      • Davey Pool Pump Selection Guide
    • Shipping & Returns
    • Contact Us
    • Gift Certificates
    • Login or Sign Up

    Shop By Category

  • Shop by Brand
    • Atlas Filtri
      • Cartridge Filter Systems
      • UV Water Disinfection
      • Hydra Self Cleaning Filters
      • Filter Cartridges
    • Bianco
      • Bianco Pressure Pumps
      • Bianco Submersible Pumps
      • Bianco tank disinfectant
      • Bianco Engine Drive Pumps
    • DAB
      • DAB Pressure Pumps
    • Davey
      • Davey Pressure Pumps
      • Davey Pressure Tanks
      • Davey Rainbank Pumps
      • Davey Sump Pumps
      • Davey Fire Fighter Pumps
      • Davey Transfer Pumps
      • Davey Pool Pumps
      • Davey Water Filtration
    • Grundfos
      • Grundfos Pressure Pumps
      • Grundfos Pressure Tanks
      • Grundfos Sump Pumps
      • Grundfos Circulator Pumps
      • Grundfos Vertical Multistage
      • Grundfos End Suction Pumps
      • Grundfos Spare Parts
    • Lowara
      • Lowara Sump Pumps
    • Mono
    • Puretec
    • Southern Cross
      • Southern Cross Sovereign
      • Southern Cross Starline
  • Shop by Application
    • Pressure Pumps
      • Grundfos Pressure Pumps
      • Davey Pressure Pumps
      • DAB Pressure Pumps
      • Bianco Pressure Pumps
    • Pressure Tanks
      • Grundfos Pressure Tanks
      • Davey Pressure Tanks
    • Pool Pumps
      • Davey Pool Pumps
    • Rainwater to Mains
      • Davey Rainbank Pumps
      • Acquasaver
    • Fire Fighting Pumps
      • Bianco Vulcan Engine Driven Pumps
      • Davey Firefighter Pumps
    • Sump Pumps
      • Grundfos Submersible Pumps
      • Davey Submersible Pumps
    • Transfer Pumps
      • Davey Transfer Pumps
    • Pumps for Concrete Plants and Quarries
      • Heavy Duty Submersible Pumps
    • Borehole Submersible
      • Grundfos Borehole Submersibles
    • Circulator Pumps
      • Grundfos Circulator Pumps
    • End Suction Pumps
      • Southern Cross End Suction Pumps
  • Filtration
    • Atlas Filtri Filtration
      • Cartridge Filter Systems
      • UV Water Disinfection
      • Hydra Self Cleaning Filters
      • Filter Cartridges
      • Water Tank Disinfection
    • Puretec
      • One Tap Undersink System
      • Mains Water Filtration
      • Tank Water Filtration
      • Filter Cartridges and UV Lamps
    • Davey Microlene Filtration
      • One Tap Undersink System
      • UV Water Disinfection
      • Water tank disinfection
      • Filter cartridge replacements
      • Cartridge filter systems
      • Acquasafe
  • Pump Accessories
  • Pipework and Fittings
    • Blueline Poly Pipe
    • Nyglass Threaded Fittings
      • Barrel Union Nyglass
      • Female Tee Threaded
      • Foot Valve Nyglass
      • Hex Nipple
      • Hex Plug Nyglass
      • Hex Socket
      • Hose Tail Nyglass
      • Reducing Bush
      • Reducing Hex Nipple
      • Reducing Hex Socket
      • Threaded Female Elbow
      • Threaded Male/Female Elbow
    • Tank Float Valves
    • Fittings for Blueline Poly
    • Pressure Tank Hoses
    • Rural Poly Pipe
    • Suction Hoses
    • Fittings for Rural Poly
    • Y Strainers
  • Shop All
  • Shop By Brand

  • Davey
  • Grundfos
  • DAB
  • Puretec
  • Atlas Filtri
  • Bianco
  • Plasson
  • Microlene
  • Lowara
  • Mono
  • View all Brands
    • Shop by Brand
    • Selection Guides
      • Grundfos Pressure Pump Selection Guide
      • Davey Pressure Pump Selection Guide
      • Davey Pool Pump Selection Guide
    • Shipping & Returns
    • Contact Us
    • Gift Certificates
    • Login or Sign Up
    • Home
    • Shop by Application
    • TotalFlo TF180S Submersible Pump
  • Davey TotalFlo TF180S Submersible Pump
  • Davey TotalFlo TF180S Submersible Pump

    TotalFlo TF180S Submersible Pump

    Add to Wish List
    • Create New Wish List

    Davey

    MSRP:
    Was:
    Now: $247.00
    (You save )
    (No reviews yet) Write a Review
    SKU:
    TF180S
    Shipping:
    $25.00 (Fixed Shipping Cost)
    Adding to cart… category.add_cart_announcement
    • Facebook
    • Email
    • Print
    • X
    • Pinterest
    • Overview
    • Other Details
    • Reviews

    Product Description

    The TotalFlo range of submersible pumps are an ideal wastewater pump at a great price. 

    The TF180S has a 0.33kw, single phase motor capable of flow rates up to 180 litres per minute. Ideal for clean and wastewater pumping and due to it's quiet operation, suitable for residential application. 

    2 Year Warranty

    Australia Wide Delivery

     

     

    Other Details

    2 Year Warranty

    Product Videos

    Custom Field

    Product Reviews

    Write a Review

    Write a Review

    ×
    Davey TotalFlo TF180S Submersible Pump
    Davey
    TotalFlo TF180S Submersible Pump

    ×
    ×

    Join Our Mailing List for special offers!

    Contact Us

    2/4 Johnstone Road
    Brendale QLD 4500

    Accounts & Orders

    • Wishlist
    • Login or Sign Up
    • Shipping & Returns

    Quick Links

    • Shop by Brand
    • Selection Guides
    • Shipping & Returns
    • Contact Us
    • © Aquifer Pumps
    • |
    • Sitemap
    • |
    • Premium BigCommerce Theme by Lone Star Templates